Facilities Management

Physical Plant • University of Maine at Fort Kent • 23 University Drive, Fort Kent, ME 04743
 Email Us (207) 834-7670

Capital Construction Projects

Projects Open for Bids

UMS/NetworkMaine - Optical Network Generator Installations

Project Summary: Provide labor, materials, equipment, supervision and services as required for the installation of standby power generator systems at University Campus locations indicated. The work shall include installing a standby generator at each location and associated distribution equipment required for providing power to critical network equipment and some other loads. The scope of work shall include all associated work as indicated on the Harriman drawings and specifications.

Bids will be received until 2:00 PM on Thursday, July 11, 2019, at 25 Bedford Street, Portland, ME at which time the Bids will be opened and read aloud in the 25 Bedford Street, Conference Room. Bids received after the stated time will not be considered and will be returned unopened.

All Bidders may attend non-mandatory pre-bid meetings as follows:

  • Farmington, University of Maine at Farmington Fusion Space, on Tuesday, June 25, 2019, at 11AM
  • Belfast, University of Maine Hutchinson Center, on Tuesday, June 25, 2019, at 2 PM
  • Fort Kent, University of Maine at Fort Kent Cyr Hall, on Monday, July 1, 2019, at 9 AM
  • Presque Isle, University of Maine at Presque Isle, Folsom Hall, on Monday, July 1, 2019, at 12 PM
  • Houlton, University College Houlton Higher Education Center, on Monday, July 1, 2019, at 2 PM

Attendance at these meetings by Bidders or qualified representative is a mandatory prerequisite for the acceptance of a bid. This will be the only time the building will be available for inspection. Copies of plans and specifications will not be available at the pre-bid meeting. Acquiring or reviewing plans and specifications prior to the meeting is advised.

More information as it becomes available will be posted at the following website:
https://usm.maine.edu/facilities/current-projects

UMFK Enrollment & Advancement Center

Project Start Date: Spring 2020
Contractor Type: Architectural & Engineering Design Services
Project Documents: Full RFQ | UMFK Campus Map


Project Description:

NOTICE TO DESIGNERS

Enrollment & Advancement Center

The University of Maine at Fort Kent, located in Fort Kent, Maine, desires to procure architectural and engineering design services from individual firms or teams for an ENROLLMENT & ADVANCEMENT CENTER project. The proposed facility would consist of the construction of a new 8,400 SF building to meet program objectives and to integrate student enrollment and advancement service departments.    

All letters of interest with submittal packages must be received in the location listed in the RFQ prior to 2:00 PM on Friday, May 31, 2019.


Construction Project List

Project Name Dates Contractor Name Contractor Type
UMS/NetworkMaine - Optical Network Generator Installations      
UMFK Enrollment & Advancement Center Spring 2020    
UMFK Fox Auditorium - Fire Protection Upgrades 5/20/2019 to 8/15/2019    
University of Maine System Wide Exterior Lighting 3/18/2015    
Pleasant Street Academy Biomass District Heating System 12/11/2012    
Sports Center Roof Replacement 6/16/2011 to 7/29/2011 G. L. Strout and Sons Welding Sub-contractor
Sports Center Roof Replacement 6/16/2011 to 7/29/2011 Ken-L-Electric Sub-contractor
Sports Center Roof Replacement 6/16/2011 to 7/29/2011 Central City Sheet Metal Sub-contractor
Sports Center Roof Replacement 5/16/2011 to 7/29/2011 Ganneston Construction General
Sports Center Roof Replacement 5/16/2011 to 7/29/2011 Powers Roofing and Sheet Metal Sub-contractor
Cyr Roof 2/5/2010 to 7/13/2010 Mr. Smith General
Cyr Roof 2/5/2010 to 7/13/2010 Powers Sub-contractor
 

The preceding information is provided in accordance with Public Law, Chapter 452 LD 1456, item 1,
"An Act To Ensure That Construction Workers Are Protected by Workers' Compensation Insurance."